Outbuildings
| FGR5 | GARAGE W/LFT G | | | 1152.00 S.F. | $34,100 | $34,100 | 1 | UP TOP OF DRIVEWAY |
| FGR2 | GARAGE-GOOD | | | 960.00 S.F. | $22,300 | $22,300 | 1 | ATT TO L OF FGR5 |
| FGR1 | GARAGE-AVE | | | 960.00 S.F. | $17,700 | $17,700 | 1 | FGR=1 GRAVEL. ATT TO R SIDE OF FGR5 |
| FGR5 | GARAGE W/LFT G | | | 864.00 S.F. | $25,600 | $25,600 | 1 | DOWN BY HOUSES. UNFIN FOR 4/1/19 |
| SHP2 | WORKSHOP GOOD | | | 432.00 S.F | $11,100 | $11,100 | 1 | ATT TO FGR DOWN BY HOUSES. UNFIN FOR 4/1/19 |
| SOPE | SOLAR ROOF ELEC | | | 77.00 UNITS | $7,700 | $7,700 | 1 | ATTACHED TO GARAGE AT TOP OF HILL NEAR HOUSE. |
| SOPE | SOLAR ROOF ELEC | | | 36.00 UNITS | $3,600 | $3,600 | 1 | |
| SPL1 | SW POOL INGROUND | | | 666.00 S.F. | $18,000 | $18,000 | 1 | |
| PAT1 | PATIO-AVG | | | 1000.00 S.F. | $3,900 | $3,900 | 1 | PER BP |