Outbuildings
| PAV1 | PAVING-ASPHALT | | | 60000.00 S.F. | $142,500 | $142,500 | 1 | |
| LT5 | L-MERC VAP/FLU | | | 5.00 UNITS | $4,800 | $4,800 | 1 | |
| PAV2 | PAVING-CONCRETE | | | 700.00 S.F. | $2,600 | $2,600 | 1 | |
| FN8 | F-W/O TOPRL-6' | | | 60.00 L.F. | $700 | $700 | 1 | AROUND CON. PAD-GARBAGE BIN |
| FN4 | FENCE-8' CHAIN | | | 756.00 L.F. | $12,900 | $12,900 | 1 | |
| FGR1 | GARAGE-AVE | | | 1764.00 S.F. | $64,900 | $64,900 | 1 | |
| FCP | F-CARPORT METAL | | | 420.00 S.F. | $3,700 | $3,700 | 1 | ATTACHED TO LEFT SIDE OF FGR1
|
| FCP | F-CARPORT METAL | | | 420.00 S.F. | $3,700 | $3,700 | 1 | ATTACHED TO RIGHT SIDE FGR1 |