Visit History
| 9/12/2025 | Measur/Inf/Dr Info taken at door. | |
| 9/12/2025 | Measur+1Visit | |
| 12/28/2018 | FINAL | enclosed deck & carport |
| 3/27/2013 | Listed | |
| 4/26/2012 | Assessor Reviewed | FAMILY EACH ONE DUPLEX DEEDS TO EACH SIDE NOT A CONDO 50% OFF LAND FOR TOTAL ASSESSMENT EQUAL TO TOTAL LOT AS DUPLEX |
| 3/31/2012 | Certificate of Occupancy | RIGHT SIDE OF BLDG. |
| 7/5/2011 | Electric Service | |
| 6/6/2011 | Foundation | FOR SECOND UNIT CLOSEST TO STREET |
| 8/10/2010 | Measur+Listed | FINAL ON LEFT SIDE RIGHT TO COME LATER |
| 9/23/2009 | Septic System Inspection | FIRST BOTTOM OF BED 9 21/09 |