Visit History
| 12/3/2025 | Measur+1Visit | |
| 10/21/2025 | Change Data Mailer Returned | |
| 8/18/2022 | Inspection Assessing | ENTERED HS EXEMPT- REV PROP- ADDED 661-SQFT TQS OVER THE FGR- REWORKED THE FUS/BAS/UBM AS IT WAS BACKWARDS- ADDED 6X4 UST |
| 9/21/2020 | Card Prepped | UC FOR NEW CONSTRUCTION AND BUILT UP. |
| 10/17/2008 | Changed Lot Size | PER SUBDIV |