Visit History
| 6/2/2025 | Measure - Info Card left | 5:50 |
| 2/7/2025 | Measur+1Visit | |
| 2/26/2021 | Measur+Listed | UC FOR FINISHED SPACE ABOVE GARAGE AND AN ADU. |
| 11/25/2019 | Measur+Listed | VERIFY SHED. |
| 5/16/2015 | Listed | GEO THERMAL HEAT; M/BATH = 4 PC M/BATH (2 SINKS); BAMBOO FLOORING. |
| 5/7/2015 | Card Prepped | PLAN SHOWS CATHEDRAL CEILING AND LOFT ON FUS/WILL NEED TO CHANGE |
| 1/15/2015 | FINAL | |
| 12/10/2014 | INSULATION INSPECTION | BASEMENT CEILING |
| 11/21/2014 | INSULATION INSPECTION | |
| 11/14/2014 | Elec Rough In | |
| 10/29/2014 | PLUMBING ROUGH IN | |
| 10/29/2014 | Framing | |
| 10/7/2014 | Electric Service | |
| 9/24/2014 | Foundation | |
| 10/20/2008 | No change | PER SUBDIV |