Visit History
| 9/16/2025 | Measure - Info Card left | |
| 9/16/2025 | Measur+1Visit | |
| 8/18/2022 | Inspection Assessing | ENTERED HOMESTEAD EXEMPTION- REV PROP- ADDED 10X10 WDK- SEE PICS |
| 1/3/2018 | Measur+Listed | CO INSPECTION WITH CEO, HEAT PUMP AS PRIMARY HEATING SYSTEM, GAS FIREPLACE IN THE LIVING ROOM AS SECONDARY HEATING SYSTEM |
| 1/3/2018 | FINAL | |
| 1/3/2018 | Card Prepped | |
| 12/8/2017 | TOP OF PIPE | |
| 12/6/2017 | SUB GRADE | |
| 11/7/2017 | INSULATION INSPECTION | |
| 11/3/2017 | Elec Rough In | |
| 10/27/2017 | Framing | |
| 10/27/2017 | PLUMBING ROUGH IN | |
| 8/25/2017 | Electric Service | |
| 8/21/2017 | Foundation | |
| 5/15/2017 | SUB GRADE | |