Visit History
| 9/16/2025 | Measur/Inf/Dr Info taken at door. | |
| 1/3/2018 | Listed NOH | FIRE REPAIR OF ROOM ABOVE GARAGE |
| 11/6/2017 | FINAL | |
| 10/3/2017 | INSULATION INSPECTION | |
| 9/27/2017 | Framing | |
| 9/27/2017 | PLUMBING ROUGH IN | |
| 9/14/2017 | Elec Rough In | |
| 1/17/2015 | Assessor Reviewed | E TO A |
| 1/17/2008 | Listed NOH | |
| 12/5/2006 | Framing | DID ROUGH PLUMBING TOO |
| 3/29/2006 | Electric Finish | |
| 3/28/2006 | Measur+Listed | |
| 1/30/2006 | Septic System Inspection | TOP OF BED,NOT CONNECTED TO TANK YET,LOTS OF SNOW IN YARD TODAY |
| 1/23/2006 | Septic System Inspection | BOTTOM OF BED |