Visit History
| 2/19/2025 | Measur+1Visit | |
| 7/17/2023 | Change Legal Ownership Change | NEW OWNER UPDATE- FUTURE SALE- REV PROP VIA NEARMAP2023 AND BUILD PERMITS- ADJUSTED: 8X16 FOP TO FEP, 22X9 FEP TO WDK- ADDED: GENERATOR CIR 2020, HEAT PUMP, 84-SQFT BAS, 12X19 WDK, 12X18 PTO- REWORKED FGR FOR UGR COMPONENT |
| 3/7/2017 | Changed Mailing Address | |
| 1/17/2015 | Assessor Reviewed | |
| 10/21/2008 | Changed Lot Size | PER SUBDIV |
| 4/13/2007 | Final Miscellaneous | CO ISSUED |
| 4/2/2007 | Changed Lot Size | PER SURVEY, CHANGED LOT SIZE FOR THIS PARCEL. |
| 3/29/2007 | Measur+Listed | |
| 1/3/2007 | Plumbing | |
| 1/3/2007 | Framing | |
| 10/31/2006 | Electric Service | REVISIT |
| 10/30/2006 | Electric Service | FAILED SERVICE OUTLET BOX |
| 9/29/2006 | Electric Service | TRENCH INSPECTION |
| 9/28/2006 | Foundation | |