Visit History
| 2/12/2025 | Measur/Inf/Dr Info taken at door. | |
| 8/24/2022 | Inspection Assessing | REV PROP FOR POTENTIAL NBHD ANALYSIS- ADJUSTED: 26X6 UOP TO FOP, ADD HEAT PUMP, ADD 468-SQFT PATIO, ADD 12X20 SHED AVE |
| 8/17/2020 | Electric Finish | Underground wire for pool |
| 8/10/2020 | Card Prepped | ABOVE GROUND POOL. |
| 7/1/2020 | Electric Finish | Pool bonding |
| 4/22/2015 | Listed | INFO AT DOOR - OWNER REFUSED ENTRY. I WAS ALLOWED TO MEASURE. EXCELLENT CONTRACTOR. |
| 11/14/2014 | FINAL | |
| 8/26/2014 | Elec Rough In | |
| 8/26/2014 | Framing | |
| 8/26/2014 | PLUMBING ROUGH IN | |
| 7/31/2014 | Electric Service | |
| 7/9/2014 | PLUMBING SUB SLAB | |
| 7/2/2014 | Foundation | |
| 3/15/2009 | Listed NOH | NO START |
| 10/21/2008 | Changed Lot Size | PER SUBDIV |
| 3/13/2008 | Measur+Listed | INFO AT DOOR - OWNER REFUSED ENTRY. I WAS ALLOWED TO MEASURE. EXCELLENT CONTRACTOR. DAYLIGHT WALKOUT BSMT. |