Visit History
| 9/17/2025 | Measur/Inf/Dr Info taken at door. | |
| 10/25/2017 | Changed Mailing Address | |
| 4/19/2016 | Listed | COMPLETE INSPECTION. HARDWOOD THROUGHOUT_FULL FINISHED DAYLIGHT BASEMENT_RECESSED LIGHTS_QUALITY MATERIALS AND CABINETS KITCHEN. |
| 3/4/2016 | FINAL | |
| 12/8/2015 | INSULATION INSPECTION | |
| 11/19/2015 | PLUMBING ROUGH IN | |
| 11/18/2015 | Elec Rough In | |
| 11/16/2015 | Framing | |
| 9/17/2015 | TOP OF PIPE | |
| 9/16/2015 | SUB GRADE | |
| 9/10/2015 | PLUMBING SUB SLAB | |
| 8/28/2015 | Foundation | |
| 11/27/2012 | Assessor Reviewed | PER CEO, THIS LOT IS NOT BUILDABLE AS IS DUE TO MINIMUM LOT FRONTAGE REQUIREMENTS OF THE SACO ZONING ORDINANCE. SEE ASSOC. DOCUMENTS. REDUCED LOT ASSESSMENT 50%. |