Visit History
| 3/5/2025 | Assessor Reviewed | |
| 11/8/2024 | Measur+1Visit | |
| 4/2/2024 | Inspection Assessing | NO CHANGE IN ASSESSMENT |
| 8/12/2020 | Foundation | Southeast wall rebar |
| 8/6/2020 | Foundation | Rebar on north wall, east end |
| 8/3/2020 | Foundation | Rebar on north wall, west end first floor |
| 7/22/2020 | Foundation | West foundation wall |
| 6/30/2020 | PLUMBING SUB SLAB | Northeast sector first floor |
| 6/22/2020 | PLUMBING SUB SLAB | |
| 6/18/2020 | PLUMBING SUB SLAB | |
| 6/18/2020 | PLUMBING SUB SLAB | |
| 6/15/2020 | Foundation | East wall and ramp footing |
| 6/8/2020 | Foundation | North wall |
| 5/28/2020 | Electric Service | Trench |
| 5/27/2020 | PLUMBING SUB SLAB | |
| 5/14/2020 | Foundation | Footing and foundation rebar inspection, west wall |
| 5/7/2020 | Foundation | Foundation and rebar inspection for east wall and footings, and west wall |
| 5/5/2020 | PLUMBING SUB SLAB | Underground floor drain |
| 4/27/2020 | Foundation | |
| 12/18/2018 | Changed Lot Size | 2017 SUBDIVISION PLAN SHOWS 12.56 ACRES FOR THIS PARCEL IN MILL BROOK_ADDED 4.78 ACRES AND REDUCED THE LAND VALUE TO REFLECT THE USEABLE PORTION OF THE PARCEL |
| 3/21/2018 | Listed NOH | |
| 11/21/2016 | Measur+Listed | CENTRAL AIR SYSTEM; MIX OF CARPET, TILES, CONCRETE FLOORING, DROP CEILING IN OFFICE AREA; BASIC FIXTURES; SPECIALIZED EQUIPMENTS |
| 4/14/2016 | FINAL | |
| 1/5/2016 | Elec Rough In | |
| 12/8/2015 | PLUMBING ROUGH IN | |
| 11/25/2015 | Elec Rough In | |
| 11/19/2015 | Elec Rough In | |
| 9/8/2015 | Elec Rough In | |
| 9/8/2015 | PLUMBING SUB SLAB | |
| 9/2/2015 | PLUMBING SUB SLAB | |