Visit History
| 2/14/2025 | Measur+1Visit | |
| 6/30/2022 | Inspection Assessing | REVIEWED 6.22 LISTING- ADJUSTED: GRADE FROM GOOD 20 TO VERY GOOD- DEPRECIATION FROM AVERAGE TO VERY GOOD- LANDLINE 1010 TO 101B- ADDED JACUZZI- GAS FP- EXTRA PLUMB FEATURE- REWORK POOL HOUSE TO 325 SQFTBTH2W/PLUMB AND 187-SQFT SHED GOOD- BLD PRMS CIR 2018 |
| 4/21/2022 | Inspection Assessing | UPDATED PHOTOS- CHANGED 416-SQFT SHED TO 416-SQFT BTH2 W/PLUMBING- BATHHOUSE W/PLUMBING |
| 12/18/2020 | Assessor Reviewed | UPDATED BASED ON REALTY LISTING |
| 7/18/2018 | FINAL | |
| 5/16/2018 | INSULATION INSPECTION | |
| 5/14/2018 | Framing | |
| 5/14/2018 | Elec Rough In | |
| 5/14/2018 | PLUMBING ROUGH IN | |
| 4/4/2018 | Foundation | |
| 3/26/2018 | Listed NOH | NOT STARTED, UC |
| 5/16/2015 | Listed NOH | LEFT DT - BSMT FINISH - SQUARE FOOTAGE? NOTHING ON BP? PER PEMIT # 6798 - 9/10/2014 - 3 PLUMBING FIXTURES. - EST 1,100 SF FROM CEO SKETCH. |
| 10/3/2014 | FINAL | BASEMENT |
| 9/16/2014 | PLUMBING ROUGH IN | BAASEMENT |
| 9/16/2014 | Elec Rough In | BASEMENT |
| 9/16/2014 | Framing | BASEMENT |
| 9/11/2014 | PLUMBING SUB SLAB | BASEMENT |
| 3/15/2009 | Listed NOH | |
| 6/9/2008 | Plumbing | POOL HOUSE |
| 5/19/2008 | Framing | POOL HOUSE |
| 4/28/2008 | Plumbing | SUB-SLAB POOL HOUSE |
| 4/23/2008 | Final Miscellaneous | CO ISSUED |
| 3/13/2008 | Measur+Listed | |
| 1/25/2008 | Plumbing | |
| 1/25/2008 | Framing | |
| 1/22/2008 | Changed Lot Size | CHANGED LOT SIZE, NOW BUILDABLE AND CONFORMING PER CEO. |
| 12/31/2007 | Foundation | REQUESTED CONFIRMATION ON SETBACKS AS LOT WAS COVERED WITH SNOW AND PROPERTY LINES WERE NOT EVIDENT. FOUNDATION NEEDED COATING |