Visit History
| 4/9/2025 | Measur/Inf/Dr Info taken at door. | |
| 7/3/2024 | Inspect At Owners Request | SPOKE WITH OWNER. CHANGED BEDROOM/BATHROOM COUNT, HEAT FUEL, HEAT TYPE, ADDED HEAT PUMP |
| 3/31/2015 | Listed | LISTED 10X14 SHED |
| 3/30/2013 | Listed | 4 PC BATH; HW & CPT FLOOR / TILE BATHS. GAS FP; GOOD KITCHEN |
| 11/1/2012 | FINAL | |
| 9/12/2012 | INSULATION INSPECTION | |
| 9/7/2012 | PLUMBING ROUGH IN | |
| 9/7/2012 | Framing | |
| 9/7/2012 | Elec Rough In | |
| 7/30/2012 | PLUMBING SUB SLAB | |
| 7/24/2012 | Foundation | |
| 11/29/2007 | New Lot Created | SUBDIVISION LOT |