| 9/5/2025 | Measur/Inf/Dr Info taken at door. | |
| 7/5/2025 | Measur+1Visit | |
| 3/22/2021 | Inspection Assessing | OWNER CALLED AND INFORMED THAT THE STRUCTURAL WORK WAS COMPLETE AND ONLY SOME MINOR COSMETIC WORK NEEDED TO BE COMPLETED |
| 10/7/2020 | Card Prepped | UC FOR 32X8 FARMERS PORCH. |
| 11/9/2017 | FINAL | ROOM OVER GARAGE |
| 4/18/2015 | Listed | DWG IS DONE; NO FINISH ABOVE GARAGE AT TIME OF INSP; TILE BATHS; FORMICA COUNTERS; AVG-GOOD CABINETS; HW 1ST FLR; CPT BEDRMS; MASTER BATH. |
| 4/17/2015 | FINAL | |
| 3/30/2015 | Electric Service | |
| 3/24/2015 | INSULATION INSPECTION | |
| 3/20/2015 | Plumbing | |
| 3/20/2015 | Elec Rough In | |
| 3/20/2015 | Framing | |
| 3/4/2015 | TOP OF PIPE | |
| 3/3/2015 | SUB GRADE | |
| 2/27/2015 | Foundation | |
| 10/28/2014 | Changed Lot Size | CHANGED SIZE OF LOT PER PROPOSED DEED CONVEYANCE AND NEW PLAN (JASON & AMY LABONTE). |