Visit History
| 9/25/2025 | Measur/Inf/Dr Info taken at door. | |
| 3/27/2013 | Listed NOH | |
| 6/22/2012 | FINAL | |
| 3/31/2012 | Measur+1Visit | SHEETROCKED NOT TAPED. ACCESS TO GARAGE? - ENTERED AS UQS - CHECK 2013. |
| 3/26/2012 | INSULATION INSPECTION | |
| 3/8/2012 | PLUMBING ROUGH IN | |
| 3/8/2012 | Framing | |
| 3/7/2012 | Elec Rough In | |
| 12/16/2011 | TOP OF PIPE | FIRST INSPECTION, CONTRACTOR FAILED TO CALL FOR SUBGRADE INSPECTION |
| 11/17/2011 | Foundation | DID NOT PASS. ANCHOR BOLTING SPACED TOO FAR APART, LEFT FIELD CORRECTION ORDER IN EXCAVATOR. |
| 6/10/2011 | New Lot Created | |