Visit History
| 9/12/2025 | Measure - Info Card left | 4:53 |
| 9/12/2025 | Measur+1Visit | |
| 5/5/2020 | FINAL | |
| 4/13/2020 | INSULATION INSPECTION | |
| 4/9/2020 | Elec Rough In | |
| 4/9/2020 | Framing | |
| 10/13/2017 | Framing | DECK |
| 3/31/2012 | Certificate of Occupancy | RIGHT SIDE OF BLDG. |
| 7/5/2011 | Electric Service | |
| 6/6/2011 | Foundation | FOR SECOND UNIT CLOSEST TO STREET |
| 8/10/2010 | Measur+Listed | FINAL ON LEFT SIDE RIGHT TO COME LATER |
| 9/23/2009 | Septic System Inspection | FIRST BOTTOM OF BED 9 21/09 |