Visit History
| 7/24/2025 | Measur/Int Refusal No information give | |
| 4/22/2020 | FINAL | |
| 2/10/2020 | Measur+Listed | ADJUSTED SKETCH AFTER SEAN DID INSPECTION AND FOUND THE TQS WAS WRONG AND ADDED CATHEDRAL CEILING AND GAS FIREPLACE. |
| 1/31/2020 | Electric Finish | |
| 1/31/2020 | FINAL | Bathroom in basement |
| 12/19/2019 | Elec Rough In | |
| 3/26/2019 | FINAL | |
| 3/19/2019 | Measu/LtrSnt Letter Sent no response | |
| 2/1/2019 | INSULATION INSPECTION | |
| 1/31/2019 | PLUMBING ROUGH IN | |
| 11/8/2018 | TOP OF PIPE | |
| 11/7/2018 | Electric Service | |
| 11/7/2018 | SUB GRADE | |
| 11/5/2018 | Foundation | |
| 9/27/2012 | New Lot Created | LOT WAS CREATED PER DEED SPLITTING 200 X 400 PARCEL FROM 091-006-000-000. |