Visit History
| 7/24/2025 | Measur/Inf/Dr Info taken at door. | |
| 7/24/2025 | Measur+1Visit | |
| 3/12/2021 | Inspection Assessing | OWNER CALLED. GARAGE COMPLETE, BUT BONUS ROOM ABOVE NOT DONE |
| 2/4/2021 | Measur+Listed | UC FOR FINSIH ABOVE GARAGE 28X24. |
| 8/10/2020 | Card Prepped | UC FOR DETACHED GARAGE. LEFT PERCENT GOOD AT ORIGINAL. |
| 6/11/2020 | Foundation | Garage |
| 3/19/2019 | Measu/LtrSnt Letter Sent no response | |
| 11/9/2018 | FINAL | |
| 7/24/2018 | INSULATION INSPECTION | |
| 7/16/2018 | Elec Rough In | |
| 7/13/2018 | PLUMBING ROUGH IN | |
| 7/2/2018 | Framing | |
| 5/21/2018 | TOP OF PIPE | |
| 5/18/2018 | SUB GRADE | |
| 5/17/2018 | Foundation | |
| 10/4/2012 | New Lot Created | LOT CREATED PER DEED, SPLIT FROM 091-006-000-000. |