Visit History
| 2/18/2025 | Measur+Listed | |
| 8/17/2023 | Inspect At Owners Request | HOMEOWNER IS ENROLLED IN STABLIZATION PROGRAM22/23- ADJUSTMENTS MADE DO NOT DROP BELOW 2022 ASSESSMENT VALUES- THIS WAS EXPLAINED TO OWNER AND HE UNDERSTOOD NO ABATEMENT WOULD BE ISSUED BUT INFO WOULD BE CHANGED MOVING FORWARD. |
| 8/17/2023 | Inspect At Owners Request | INSPECTION OF BASEMENT ONLY PER OWNERS REQUEST- HAS HAD FBM LISTED SINCE HOUSE WAS BUILT- BASEMENT IS NOT FINISHED- CHANGES FBM TO UBM- REMOVE 2 EXTRA FIXTURES FROM CONSTRUCTIONS DETAILS AND CHANGED 2 STORY TO 1 |
| 8/24/2022 | Inspection Assessing | REV PROP FOR POTENTIAL NBHD ANALYSIS- PER BUILD PLANS ADDED THE FOLLOWING: GAS FP, EXTRA PLUMB FEATURE X2 FOR DOG WASH STATION AND DBL BATH SINK. REWORKED 11X14 WDK- ADD GENERATOR PER BUILDING PERMIT FROM 2020 THAT GENERATOR WAS INSTALLED- 5X23 UOP TO FOP |
| 4/13/2015 | Listed | DID NOT INSPECT BSMT AREA - PER WIFE - NO FINISH IN BSMT. RADIANT FLOORS IN BATHS; MINI SPLIT IN LIVING ROOM AREA. |
| 10/7/2014 | Card Prepped | SKETCHED FROM PERMIT/PLANS |
| 7/2/2014 | FINAL | |
| 5/16/2014 | INSULATION INSPECTION | |
| 5/14/2014 | PLUMBING ROUGH IN | |
| 5/14/2014 | Framing | |
| 5/8/2014 | Elec Rough In | |
| 3/20/2014 | Electric Service | |
| 3/14/2014 | Foundation | |
| 5/1/2013 | New Lot Created | LOT CREATED PER APPROVED COPPERLEAF SUBDIV PLAN SIGNED 2-12-2013. |