Visit History
| 9/26/2025 | Measure - Info Card left | |
| 9/26/2025 | Measur+1Visit | |
| 11/10/2021 | Change Legal Ownership Change | NEW OWNER UPDATE- PER REALTOR PHOTOS- GARAGE/BREEZEWAY/BONUS ROOM ADDED TO SKETCH- HEAT PUMP ADDED TO CONSTRUCTION DETAILS- SKY LIGHT AND EXTRA PLUMB ADDED TO EXTRA FEATURES |
| 12/12/2017 | FINAL | |
| 10/20/2017 | INSULATION INSPECTION | |
| 10/12/2017 | Elec Rough In | |
| 10/12/2017 | PLUMBING ROUGH IN | |
| 9/1/2017 | Framing | |
| 6/19/2017 | Foundation | GARAGE |
| 1/12/2017 | Listed | (3) BDRM; AVERAGE KITCHEN; AVERAGE BATHS; REMOVED UC CONDITION; ADD PHOTO |
| 11/1/2016 | FINAL | |
| 10/31/2016 | Listed | SITE VISIT, UC 50% |
| 9/21/2016 | Electric Service | |
| 9/20/2016 | INSULATION INSPECTION | |
| 9/16/2016 | Framing | |
| 9/16/2016 | Elec Rough In | |
| 9/16/2016 | PLUMBING ROUGH IN | |
| 8/26/2016 | Card Prepped | UC = NEW HOUSE |
| 7/29/2016 | TOP OF PIPE | |
| 7/26/2016 | Foundation | |
| 7/26/2016 | SUB GRADE | |
| 11/20/2013 | New Lot Created | |