Visit History
| 6/18/2025 | Measur/Inf/Dr Info taken at door. | |
| 12/27/2021 | Inspection Assessing | PHOTO UPDATE- PER ONLINE PHOTOS- ADDED EXTRA PLUMB FEATURE FOR DBL SINK IN MASTER BATH |
| 3/24/2021 | Measur+Listed | |
| 10/7/2020 | Card Prepped | BUILT UP AND UC FOR NEW CONSTRUCTION. |