Visit History
| 10/29/2024 | Measur+Listed | |
| 6/21/2022 | Changed Lot Size | REDUCED THIS LOT SIZE TO CREATE LOT 25 ON 11TH AMENDED SUB PLAN PARK NORTH |
| 5/11/2020 | FINAL | Final with SFMO |
| 4/22/2020 | FINAL | |
| 3/9/2020 | FIRE STOPPING | Sprinkler inspection with Fire Marshall |
| 3/5/2020 | Electric Service | |
| 2/4/2020 | INSULATION INSPECTION | |
| 2/4/2020 | FIRE STOPPING | Fire suppression system |
| 1/30/2020 | Elec Rough In | Trench |
| 1/30/2020 | INSULATION INSPECTION | |
| 1/28/2020 | Electric Service | Load side trench inspection |
| 1/24/2020 | Elec Rough In | Trench |
| 1/21/2020 | PLUMBING ROUGH IN | |
| 1/21/2020 | Framing | |
| 1/17/2020 | PLUMBING ROUGH IN | |
| 1/17/2020 | Elec Rough In | |
| 1/17/2020 | Framing | |
| 8/1/2019 | Foundation | Backfill |
| 3/27/2019 | New Lot Created | PARK NORTH CONTRACT ZONE AMENDMENT CREATED LOT 18 ON PLAN. |
| 2/7/2019 | Changed Lot Size | CHANGE IN SUBDIVISION PLAN - BEARS DEN DELETED AND LAND ADDED TO CREEKS EDGE 063-006-008-000 |
| 3/12/2015 | Assessor Reviewed | ADDED RECORD FOR PHASE 3 WHEN 6 CONDOS WILL BE BUILT |