Visit History
| 9/25/2025 | Measur/Inf/Dr Info taken at door. | |
| 5/7/2025 | Certificate of Occupancy | CLOSING BP#12492 WITH CO, ADDING HEAT PUMPS, SAUNA, GAS FPL, AND UPDATED PICTURES |
| 3/28/2018 | Listed NOH | |
| 12/21/2017 | FINAL | |
| 7/12/2017 | INSULATION INSPECTION | |
| 7/11/2017 | PLUMBING ROUGH IN | |
| 7/11/2017 | Framing | |
| 6/9/2017 | Electric Service | |
| 4/21/2017 | Septic System Inspection | TANK |
| 3/23/2017 | TOP OF PIPE | |
| 3/21/2017 | SUB GRADE | |
| 3/14/2017 | Changed Mailing Address | CHANGED ADDRESS FROM MCKENNEY TO JOANNA |