Visit History
| 7/29/2025 | Measure - Info Card left | 4:14 |
| 7/29/2025 | Measur+1Visit | |
| 7/30/2020 | INSULATION INSPECTION | |
| 7/22/2020 | Framing | |
| 7/22/2020 | Elec Rough In | |
| 7/22/2020 | PLUMBING ROUGH IN | |
| 5/20/2020 | PLUMBING ROUGH IN | |
| 4/7/2020 | Electric Service | Temporary Service |
| 3/31/2020 | Foundation | Backfill |
| 3/11/2020 | Card Prepped | BUILT UP AND UC. |
| 5/8/2019 | Changed Lot Size | SOLD 1.19 ACRES IN MAY 2018_REDUCED LOT SIZE |
| 3/26/2019 | Measu/LtrSnt Letter Sent no response | |
| 7/30/2018 | Changed Lot Size | REDUCED LOT SIZE BY 1.19 ACRES |
| 3/11/2016 | New Lot Created | NEW LOT FROM 098-043-001-000 - DEED OF DISTRUBTION |