Visit History
| 2/20/2025 | Measur/Inf/Dr Info taken at door. | |
| 5/22/2019 | FINAL | |
| 4/1/2019 | Measu/LtrSnt Letter Sent no response | |
| 1/14/2019 | Electric Finish | Change to permanant service |
| 8/20/2018 | Electric Finish | |
| 4/27/2018 | INSULATION INSPECTION | |
| 4/25/2018 | Elec Rough In | |
| 4/6/2018 | Framing | |
| 4/6/2018 | PLUMBING ROUGH IN | |
| 3/28/2018 | Listed NOH | UC=50% |
| 10/4/2017 | Electric Service | |
| 9/27/2017 | Foundation | |
| 12/1/2016 | New Lot Created | JUNIPER KNOLL II LOT 3 |
| 12/20/2010 | Changed Lot Size | LOT SIZE WAS REDUCED BY 10.16 ACRES DUE TO LOT SPLIT WHICH CREATED LOT 20-3 PER DEED BK: 15912 PG: 264-267. |
| 7/12/2010 | Changed Lot Size | REDUCED LOT SIZE PER SPLIT (DEEDS 15653/0632 & 0635). CHANGED OWNERSHIP PER QUITCLAIM RELEASE DEED 15661/75. |