Visit History
| 9/24/2025 | Measure - Info Card left | |
| 9/24/2025 | Measur+1Visit | |
| 10/31/2022 | Measur+Listed | REWORKED SKETCH- PARCEL WAS MISSING BED/BATH COUNT: 4 BED, 3 FULL BATH, 1 HALF BATH, ADDED 1 EXTRA PLUMB AND GAS FP- CHANGED GRADE FROM AVE 10 TO AVE 20- MIGHT CHANGE TO GOOD AFTER NBHD REVIEW |
| 3/19/2019 | Measu/LtrSnt Letter Sent no response | SENT LETTER FOR SHED NO RESPONSE. |
| 3/21/2018 | Listed NOH | |
| 12/22/2017 | FINAL | |
| 10/12/2017 | TOP OF PIPE | |
| 10/11/2017 | SUB GRADE | |
| 9/5/2017 | INSULATION INSPECTION | |
| 8/30/2017 | PLUMBING ROUGH IN | |
| 8/30/2017 | Framing | |
| 8/30/2017 | Elec Rough In | |
| 7/5/2017 | Electric Service | |
| 6/22/2017 | Foundation | |
| 3/8/2017 | New Lot Created | |