Visit History
| 7/24/2025 | Measure - Info Card left | 4:45 |
| 7/24/2025 | Measur+1Visit | |
| 4/1/2020 | Measur+Listed | |
| 12/11/2019 | Measur+Listed | BUILT UP AND TAKEN OUT OF UC. |
| 12/2/2019 | FINAL | |
| 10/25/2019 | Septic System Inspection | |
| 10/23/2019 | TOP OF PIPE | |
| 10/22/2019 | SUB GRADE | |
| 9/26/2019 | INSULATION INSPECTION | |
| 9/23/2019 | Foundation | |
| 9/23/2019 | Elec Rough In | |
| 9/20/2019 | Electric Service | |
| 9/20/2019 | PLUMBING ROUGH IN | |
| 9/11/2019 | Electric Service | Trench |
| 7/29/2019 | Foundation | Adding ufer ground |
| 6/5/2017 | Change Legal Ownership Change | |
| 3/29/2017 | New Lot Created | NEW LOT 091 003 009 000 FROM PARENT LOT 091 003 000 000 |
| 9/23/1978 | Elec Rough In | |