Visit History
| 7/29/2026 | Assessor Reviewed | CORRECTED SKETCH OF SECOND BUILDING AND LOWERED UC TO 40 |
| 4/6/2026 | Inspection Assessing | UC 80% ON BLDG 2 |
| 12/11/2025 | Assessor Reviewed | |
| 7/3/2025 | Measur+1Visit | |
| 9/11/2024 | Inspection Assessing | CO INSPECTION. CHANGED HEATING TO GAS/FORCED HOT AIR. ADDED 1 EXTRA PLUMBING FEATURE AND 1 SKYLIGHT |
| 9/14/2020 | Card Prepped | UC FOR FINISHED UPSTAIRS AND 26X26 GARAGE. |
| 6/10/2020 | INSULATION INSPECTION | |
| 4/1/2020 | Measur+Listed | NOT COMPLETE. |
| 10/4/2019 | TOP OF PIPE | |
| 9/30/2019 | SUB GRADE | |
| 9/12/2019 | INSULATION INSPECTION | |
| 8/26/2019 | PLUMBING ROUGH IN | |
| 8/26/2019 | Elec Rough In | |
| 8/26/2019 | Framing | |
| 3/26/2019 | Measu/LtrSnt Letter Sent no response | |
| 9/17/2018 | PLUMBING SUB SLAB | |
| 8/15/2018 | Foundation | |
| 6/29/2017 | New Lot Created | LOT 4_APPLE TREE LANE |