Visit History
| 6/19/2025 | Measur/Inf/Dr Info taken at door. | |
| 10/19/2022 | Measur+Listed | REWORKED SKETCH- CHANGED BED COUNT TO 3 |
| 2/3/2021 | Measur+Listed | TAKEN OUT OF UC. |
| 8/10/2020 | Card Prepped | BUILT UP AND UC FOR NEW CONSTUCTION. |
| 9/13/2017 | Assessor Reviewed | LAND LINE REDUCED_NO INFRASTRUCTURE IN 2017 |
| 7/5/2017 | New Lot Created | LOT 6_300 BRADLEY SUB |