Visit History
| 7/10/2025 | Measur+1Visit | 4:40 PM |
| 4/24/2025 | Inspection Assessing | OWNER CALLED FOR INSPECTION ON FBM. UPDATED PICTURES AND ADJUSTED SKETCH TO MATCH BUILDING PLANS FOR FBM. CLOSING BP #12043. ADDED GAS FPL. |
| 10/16/2019 | Measur+Listed | EXTERIOR INSPECTION AND PICTURE TAKEN. |
| 9/5/2019 | FINAL | |
| 5/16/2019 | INSULATION INSPECTION | |
| 5/15/2019 | Elec Rough In | |
| 5/15/2019 | Framing | |
| 5/9/2019 | PLUMBING ROUGH IN | |
| 4/3/2019 | Electric Service | Trench and temp service |
| 7/13/2017 | New Lot Created | LOT 19 PRECIOUS HIDDEN ESTATES |