Visit History
| 6/26/2025 | Measur/Inf/Dr Info taken at door. | |
| 8/22/2022 | Inspection Assessing | REV PROP FOR ASSESSMENT DISCREPANCIES AMONG THE CONDOS- REWORKED SKECTH TO BETTER REFLECT BUILDING PLANS- CHNAGED CONSTRUCTION DETAILS FLOORING- HARDWOOD/TILE |
| 6/9/2022 | Change Legal Ownership Change | NEW OWNER UPDATE- FUTURE SALE- HARDY TRANSFER- REMOVED HEAT PUMP FROM CONSTRUCTION DETAILS- ADDED 1 GAS FP- CHANGED BATH COUNT TO 2 FULL 1 HALF- AND BED COUNT TO 3 BED TOTAL |
| 2/1/2022 | Inspection Assessing | ADDED HEAT PUMP TO CONSTRUCTION DETAILS |
| 6/18/2020 | FINAL | |
| 1/31/2020 | Elec Rough In | |
| 12/9/2019 | Measur+Listed | BUILT UP. |
| 10/3/2019 | Electric Service | |
| 10/2/2018 | Assessor Reviewed | UNIT 6_LAND CONDITION FACTOR WAS WRONG FOR COMMITMENT. S/B .7_AS THEIR IS NO INFRASTRUCTURE. ABATE THE DIFFERENCE. |
| 9/20/2017 | Card Prepped | CONDOS AT DUROSS PLACE _ 8 UNITS |