Visit History
| 4/8/2025 | Measur/Inf/Dr Info taken at door. | |
| 3/30/2022 | Measur+Listed | CONFIRMED FBM WITH CONTRACTOR. |
| 1/31/2022 | Measur+Listed | UC FOR 24X24 FINISHED BASEMENT. |
| 1/28/2022 | Inspection Assessing | ENTERING BUILD PERMIT- CHECKING INFO ON HOUSE- ADDED HEAT PUMP, GAS FIREPLACE, 2 EXTRA PLUMB FEATURES FOR DBL BTH SINK IN 2 BATHROOMS, HALF BATH ADDED |
| 5/28/2020 | INSULATION INSPECTION | |
| 5/22/2020 | Elec Rough In | |
| 5/22/2020 | PLUMBING ROUGH IN | |
| 4/27/2020 | Electric Service | Check trench- make sure filled |
| 4/24/2020 | Elec Rough In | Trench |
| 4/21/2020 | Foundation | Backfill |
| 3/13/2020 | Measur+Listed | BUILT UP AND UC. |
| 12/15/2017 | New Lot Created | LOT 4_LOMBARD ESTATES |