Visit History
| 9/9/2025 | Total Refusal | |
| 9/14/2020 | Card Prepped | CONFIRMED WITH OWNER THAT DECK WAS DONE. |
| 9/30/2019 | FINAL | |
| 9/27/2019 | FINAL | |
| 9/25/2019 | Electric Finish | |
| 5/7/2019 | PLUMBING ROUGH IN | |
| 5/7/2019 | Framing | |
| 5/7/2019 | INSULATION INSPECTION | |
| 5/2/2019 | Elec Rough In | |
| 5/2/2019 | Electric Service | |
| 4/17/2019 | Electric Service | Trench |
| 3/26/2019 | Measu/LtrSnt Letter Sent no response | |
| 2/6/2019 | TOP OF PIPE | |
| 1/31/2019 | Elec Rough In | |
| 1/31/2019 | SUB GRADE | |
| 1/14/2019 | Foundation | Drainage |
| 12/10/2018 | Foundation | |
| 12/6/2018 | Foundation | |
| 12/20/2017 | New Lot Created | NEW LOT 1.707 FROM 115_022_001_000 |