Visit History
| 9/26/2025 | Measur/Inf/Dr Info taken at door. | |
| 9/26/2025 | Measur+1Visit | |
| 4/16/2019 | Measu/LtrSnt Letter Sent no response | |
| 4/2/2019 | FINAL | Final on basement |
| 1/3/2019 | INSULATION INSPECTION | basement |
| 1/3/2019 | Framing | basement |
| 8/9/2018 | Electric Service | generator |
| 7/27/2018 | FINAL | |
| 6/4/2018 | Electric Service | |
| 5/30/2018 | INSULATION INSPECTION | |
| 5/21/2018 | Elec Rough In | |
| 5/21/2018 | PLUMBING ROUGH IN | |
| 5/21/2018 | Framing | |
| 4/24/2018 | TOP OF PIPE | |
| 4/23/2018 | SUB GRADE | |
| 3/21/2018 | Card Prepped | WENT TO SITE, NOTHING STARTED |
| 1/11/2018 | New Lot Created | NEW LOT_20 OUT OF 124-006-000-000 |