| 6/9/2025 | Measur/Inf/Dr Info taken at door. | |
| 6/9/2025 | Measur+1Visit | |
| 12/22/2021 | Changed Lot Size | ADDED 7008 SQ FT FROM ABUTTER/CHANGED THIS LOT SIZE TO .44 AC |
| 4/17/2019 | FINAL | |
| 3/26/2019 | Measu/LtrSnt Letter Sent no response | UC = 98% to pick up in 2020 DR. |
| 3/15/2019 | Electric Service | |
| 2/14/2019 | Electric Service | Conduit |
| 2/6/2019 | INSULATION INSPECTION | |
| 2/1/2019 | Elec Rough In | |
| 1/31/2019 | PLUMBING ROUGH IN | |
| 1/10/2019 | Framing | |
| 12/14/2018 | Foundation | |
| 10/4/2018 | New Lot Created | |