Visit History
| 11/19/2025 | Measure - Info Card left | |
| 6/18/2025 | Measure - Info Card left | 4:30 |
| 6/18/2025 | Measur+1Visit | |
| 3/29/2023 | Inspection Assessing | |
| 1/12/2023 | Measur/New UC Under Construction | ENTER BP 9733- FULL BUILD PLANS BUT DIFFERENT FROM FOUNDATION PLANS (?) NEED TO TALK TO CODE- NOT IN ATM- BUILT UP WITH PLANS SUPPLIED- KEPT UC AT 5% UNTIL IP IN MARCH- PER BUILD PLANS ADD GAS FP AND EXTRA PLUMB X1 |
| 1/10/2023 | Measur/New UC Under Construction | ENTER BP 9530- CHANGED LANDLINE TO 1020- PERMIT IS FOR FOUNDATION ONLY, BUILT UP UBM,FGR,AND UST UNTIL MORE PLANS COME IN. SET UC AT 5% |
| 3/31/2022 | Assessor Reviewed | CHANGED ROAD LOCATION TO MANETA DR AS THAT IS WHERE THE DRIVEWAY IS. |
| 9/1/2020 | Assessor Reviewed | SEE NOTES |