Visit History
| 8/15/2025 | Measur/Inf/Dr Info taken at door. | |
| 8/20/2024 | Inspection Assessing | CONVERSATION WITH OWNER. CHANGED HARDWOORD TO LAMINATE, DELETED WDK, ADDED HEAT PUMP, CHANGED SPACED ABOVE GARAGE TO UQS. WILL FOLLOW UP WITH IN-PERSON INSPECTION |
| 8/14/2020 | FINAL | |
| 7/15/2020 | TOP OF PIPE | |
| 6/17/2020 | Electric Service | |
| 6/12/2020 | Electric Service | Trench |
| 6/4/2020 | INSULATION INSPECTION | |
| 6/1/2020 | PLUMBING ROUGH IN | |
| 5/29/2020 | Framing | |
| 5/5/2020 | Foundation | |
| 3/2/2020 | Measur+Listed | BUILT UP. |
| 2/24/2020 | New Lot Created | LOT 5 ON ELOISE PLACE SUBDIVISION |