Visit History
| 9/11/2025 | Measure - Info Card left | 4:17 |
| 9/11/2025 | Measur+1Visit | |
| 9/27/2022 | Inspection Assessing | CO ISSUED 4/29/22- REMOVED FROM UC- ADDED 8X40 WDK, HEAT PUMP, REWORKED SKETCH TO MATCH WHAT WAS BUILT- PLANS DIFFER ON UPPER STORY. |
| 5/24/2022 | Assessor Reviewed | CORRECTED SKETCH; CHANGED UC FOR 80% ON 4/1; CHECKED WITH CODE OFFICE. |
| 1/26/2021 | Measur+Listed | BUILT UP AND UC FOR NEW CONSTRUCTION. |
| 7/9/2020 | New Lot Created | NEW LOT 4.4 ACRES OUT OF 117-003-000-000 TG PENALTY ASSESSED. |