Visit History
| 2/11/2025 | Measur/Inf/Dr Info taken at door. | |
| 4/26/2023 | Changed Lot Size | UPDATED LOT TO REFLECT CURRENT PLAN |
| 2/1/2023 | Certificate of Occupancy | CO INSPECTION W/CODE- REMOVED FROM UC- ADDED NEW PICS- REWORKED SKETCH- GRADE GOOD- 24X16 TQS TO FHS- ADD GAS FP, EXTRA PLUMB FEATURE FOR UTIL SINK IN UBM- REMOVED 20X12 WDK- REDUCED UST- REMOVED 2X5 UBM/BAS BUMP OUT. |
| 1/12/2023 | Measur/New UC Under Construction | NEW SINGLE FAM CONST- ENTER BP 9595- BUILT UP AND SET UC AT 5% UNTIL IP IN MARCH- CHANGED LANDLINE TO 1010 AND CONDITION FACTOR TO 1.0- 2X5 BAS IS PART OF FOUNDATION PLAN NOT JUST BAS BUMP OUT- PER BUILD PLANS ADDED 2 EXTRA PLUMB FEATS |
| 2/2/2022 | New Lot Created | NEW LOT CREATED OUT OF 023 006 011 000 (PARENT PARCEL) |