Visit History
| 8/13/2025 | Measure - Info Card left | 4:13 |
| 8/13/2025 | Measur+1Visit | |
| 3/29/2023 | Measur/New UC Under Construction | ENTER BP FOR NEW SF CONST- BUILT UP AND SET UC AT 5% UNTIL IP- ADJUSTED: 101V TO 1010, .90 TO 1.0, PER BUILD PLANS ADDED 1 EXTRA PLUMB FEATURE- BUILD PLAN HAS FUTURE DECK PLANS WITH A TEMP LANDING- WILL NEED TO CONFIRM AT CO |
| 3/28/2023 | Changed Street Number | ASSIGNED 7 MCKINNON'S WAY PER LETTER IN ASSOC DOCS |
| 9/21/2022 | New Lot Created | CREATED LOT FROM 101-037-009-000 |