Visit History
| 6/19/2025 | Measur/Inf/Dr Info taken at door. | |
| 3/31/2025 | Inspection Assessing | REVOKED BP#13149. BP#12982 COMPLETE. ADDING 12X16 SHED TO OUTBUILDINGS. |
| 4/9/2024 | Assessor Reviewed | ADJ LAND VALUE FOR SUBDIVISION |
| 1/17/2024 | Measur/New UC Under Construction | ENTER BP 12099- BUILT UP NEW SFH AND SET UC AT 5% UNTIL P FOR 4.24- NEED TO VERIFY FOP DIMENSIONS |
| 6/15/2023 | New Lot Created | LOT 22 MACKENZIE PRESERVE. SUBDIVIDED FROM 62-18-4 |