Visit History
| 8/29/2025 | Measure - Info Card left | |
| 8/29/2025 | Measur+1Visit | |
| 8/16/2024 | Assessor Reviewed | CHANGED HEATING FROM GAS/HOT WATER TO ELECTRIC/HOT AIR FOR HEAT PUMPS. CORRECTED NAME SPELLING ERROR |
| 9/27/2023 | Measur/New UC Under Construction | ENTER BP 11176- BUILT UP SET UC AT %5 UNTIL IP FOR TY24- PER PLANS UPPER STORY IS TO REMAIN UNFINISHED- BAS HAS 1 BED/1 OFFICE W 1.5 BTH- PER PLANS ADDED 1 EXTRA PLUMB FEAT- 101V TO 1010, CF.9 TO 1.0 |
| 8/17/2023 | New Lot Created | CREATED LOT FROM 107-034-000-000. SEE ASSOC DOCS FOR DEED |