Visit History
| 7/7/2025 | Measure - Info Card left | |
| 7/7/2025 | Measur+1Visit | |
| 8/28/2024 | Inspection Assessing | INSPECTED PROPERTY. CHANGED HARDWOOD FLOOR TO VINYL. REWORKED SKETCH SLIGHTLY. DOWNGRADED GRADE TO GOOD. ADDED PHOTO |
| 2/2/2024 | Measur/New UC Under Construction | NEW SF CONDO- BUILT UP AND SET UC AT 5% UNTIL IP 4.1 |