Visit History
| 7/10/2025 | Measur/Inf/Dr Info taken at door. | |
| 7/10/2025 | Measur+1Visit | |
| 1/28/2025 | Inspection Assessing | CONSTRUCTION COMPLETE WITH CO, UPDATED PICTURES FROM VIST, REMOVED PLMX AS THERE WAS NO DBL SINKS OR OTHER EXTRA PLUMBING. ADDED CARPET AS FLR 2 AND HEAT PUMPS |
| 8/20/2024 | Measur/New UC Under Construction | ENTER BP 13084 FOR NEW SFH- BUILT UP AND SET UC AT 5% UNTIL IP- 101V TO 1010, .25 CF TO 1.0- PER BUILD PLANS EXTRA PLUMB FEAT DBL SINK- VERIFY FOP MEASUREMENT IP |
| 3/21/2024 | Card Prepped | LOT CREATED FROM 089-006-000-000. LOT 20 OF AMARI SPRING SUBDIVISION |