Visit History
| 7/10/2025 | Measur/Inf/Dr Info taken at door. | |
| 1/31/2025 | Inspection Assessing | CONSTRUCTION COMPLETE WITH CO. ADDED HEAT PUMPS, REMOVED WDK FROM SKETCH, ADDED DBL SINK AND WHIRLPOOL TUB. CLOSED BP # |
| 8/20/2024 | Measur/New UC Under Construction | ENTER BP 12910- BUILT UP SET UC AT 5% UNTIL IP- 101V TO 1010 AND .25CF TO 1.0- PER PLANS DBL BTHRM SINK |
| 3/21/2024 | Card Prepped | LOT CREATED FROM 089-006-000-000. LOT 5 OF AMARI SPRINGS SUBDIVISION |