Visit History
| 7/10/2025 | Measur/Inf/Dr Info taken at door. | |
| 8/21/2024 | Measur/New UC Under Construction | ENTER BP 12825 FOR NEW SFH- BUILT UP AND SET UC AT 5% UNTIL IP- 101V TO 1010, .25 CF TO 1.0- PER BUILD PLANS EXTRA PLUMB FEAT DBL SINK- VERIFY FOP MEASUREMENT IP |
| 3/21/2024 | Card Prepped | LOT CREATED FROM 089-006-000-000. LOT 6 OF AMARI SPRINGS SUBDIVISION |