Visit History
| 7/11/2025 | Measur+Listed | |
| 7/10/2025 | Measure - Info Card left | |
| 12/10/2024 | Inspection Assessing | CONSTRUCTION COMPLETE WITH CO. PICTURE AND HEAT PUMPS ADDED |
| 8/21/2024 | Measur/New UC Under Construction | ENTER BP 12826 FOR NEW SFH- BUILT UP AND SET UC AT 5% UNTIL IP- 101V TO 1010, .25 CF TO 1.0- PER BUILD PLANS EXTRA PLUMB FEAT DBL SINK- VERIFY FOP MEASUREMENT IP |
| 3/21/2024 | Card Prepped | LOT CREATED FROM 089-006-000-000. LOT 7 AMARI SPRINGS SUBDIVISION |