Visit History
| 2/26/2025 | Measur+1Visit | |
| 4/12/2014 | Listed NOH | LEFT DT - ADDED GARAGE W/ROOM ABOVE.- ADDED BATH PER CEO VISIT HISTORY - ADDED SHED - NO BP. |
| 10/18/2013 | INSULATION INSPECTION | GARAGE WITH ROOM ABOVE |
| 10/17/2013 | PLUMBING ROUGH IN | ROOM ABOVE GARAGE |
| 10/15/2013 | Framing | GARAGE WITH ROOM ABOVE |
| 9/30/2013 | Foundation | GARAGE WITH ROOM ABOVE |
| 4/19/2013 | FINAL | |
| 4/6/2013 | Listed NOH | COULD NOT TELL IF WORK HAS BEEN FINISHED. WINDOWS DO NOT LOOK TO HAVE BEEN REPLACED. REPAIR FROM FIRE DONE? VALUE CHG? |
| 2/26/2013 | INSULATION INSPECTION | FIRE REPAIR |
| 2/19/2013 | Elec Rough In | FIRE REPAIR |
| 1/9/2013 | Electric Service | |
| 4/26/2008 | Listed | DECK - LISTED 4-SALE; THE REAL ESTATE STORE |
| 4/5/2007 | Listed NOH | CURRENT I NFO |
| 9/19/2002 | Listed NOH | |