Visit History
| 2/25/2025 | Measur/Inf/Dr Info taken at door. | |
| 2/8/2023 | Measur+Listed | ENTER BP 10476- REV PROP VIA NEAR MAP- ADDED HEAT PUMP AND CHANGED FHS TO TQS- THERE IS A NOTE FROM 2017 THAT IT WAS TO BE CHANGED BUT NEVER WAS? |
| 11/2/2017 | INSULATION INSPECTION | |
| 11/2/2017 | PLUMBING ROUGH IN | |
| 4/3/2017 | Electric Service | |
| 11/9/2016 | Framing | |
| 11/9/2016 | Listed NOH | PERMIT VISIT # 2016-208, CHANGE UEP TO FEP, CHANGE FHS TO TQS |
| 8/20/2015 | Electric Service | |
| 4/4/2007 | Listed NOH | GOOD COND MAKE CHANGES. |
| 9/18/2002 | Listed | |