Visit History
| 3/6/2025 | Measur+1Visit | |
| 3/8/2019 | Electric Service | |
| 2/19/2019 | Electric Service | |
| 8/12/2013 | FINAL | 2ND FLOOR |
| 4/6/2013 | Listed NOH | DT - DORMERS & BATH? |
| 3/5/2013 | INSULATION INSPECTION | 2ND FLOOR |
| 8/14/2012 | Elec Rough In | 2ND FLOOR |
| 8/10/2012 | Framing | 2ND FLOOR |
| 5/5/2012 | Measur+Listed | ADDED DORMERS; OWNER DOING WORK; ADDED BATH, OPEN STUDS AT TIME OF INSP. |
| 4/4/2012 | PLUMBING ROUGH IN | 2ND FLOOR BATH |
| 9/7/2010 | Foundation | REPAIR OF FRONT CONCRETE BLOCK WALL COMPLETED |
| 2/24/2007 | Listed NOH | SPOKE WITH OWNER NO CHANGES |
| 9/17/2002 | Listed | |